top of page
Search
  • Writer's pictureJohn Fadel

PivotX 6am,9:15am 4:30pm

"Square Dance"

AMRAP 20:

27 AbMat Sit-ups

21 Dumbbell Bench Press 50 / 35 lb's

15 Pull-ups

9 Shuttle Runs


- Overview: Athletes will move through the majority of this workout at a sustainable pace. The biggest separators will be the bench press as well as the pull-ups. Pick one of these 2 movements to push today.

- Sit-Ups: Reps should take 1:00 or less to complete.

- DB Bench: Reps should take 2:00 or less to complete.

- Pull-Ups: Reps should take 1:00 or less to complete.

- Shuttle Runs: 1 Shuttle Run = 25ft. Out + 25ft. Back. Reps should take 1:00 or less to complete.

- Score: Rounds + Reps



Run Conditioning

On the Minute Until Failure:

200 Meter Run

*Maximum of 10 Ro

Modifications:

- 250m Row

- 200m Ski

- 500m Bike

- 150m Air Run


64 views1 comment

Recent Posts

See All

Overhead Squat: Option Back squat Set 1: 6 Overhead Squats @ 60% Set 2: 4 Overhead Squats @ 70% Set 3: 2 Overhead Squats @ 80% Set 4: 6 Overhead Squats @ 65% Set 5: 4 Overhead Squats @ 75% Set 6: 2 Ov

Overhead Squat Set 1: 6 Overhead Squats @ 60% Set 2: 4 Overhead Squats @ 70% Set 3: 2 Overhead Squats @ 80% Set 4: 6 Overhead Squats @ 65% Set 5: 4 Overhead Squats @ 75% Set 6: 2 Overhead Squats @ 85%

Clean Complex On the Minute x 12: 1 Power Clean 1 Hang Squat Clean - All sets should be completed unbroken. - Start at roughly 50-55% of your 1RM power clean and aim to build from there. - Score: Ente

bottom of page